High-Capacity Fiber Pulling

864‑count fiber routing planned through existing 1.5‑inch conduit infrastructure

CONTACT US
High-Capacity Fiber Pulling

Conduit Fiber Installation

Planned routing of 864‑count fiber through existing 1.5‑inch conduit system

CONTACT US
Conduit Fiber Installation

Existing Conduit Utilization

864‑count fiber route design leveraging existing 1.5‑inch conduit infrastructure

CONTACT US
Existing Conduit Utilization

Fiber Cable Deployment

864-count fiber optic cable pulling operation in standard 1.5-inch conduit

CONTACT US
Fiber Cable Deployment

Infrastructure Fiber Pull

864-count FOC installation utilizing existing 1.5-inch conduit pathways

CONTACT US
Infrastructure Fiber Pull

Conduit Capacity Optimization

864-count fiber optic cable installation maximizing existing 1.5-inch conduit space

CONTACT US
Conduit Capacity Optimization

High-Density Fiber Pull

864-count FOC installation in standard 1.5-inch existing conduit infrastructure

CONTACT US
High-Density Fiber Pull

Conduit Fiber Network

864-count fiber optic cable installation utilizing existing 1.5-inch conduit system

CONTACT US
Conduit Fiber Network
Home · Case Studies · Project 2
Telecom

High‑Count Fiber Route Planning

Summary

Permit documentation for pulling 864‑count fiber optic cable through existing 1.5" conduit and accessing existing ATT   handholes for splice and slack‑loop installation. The scope included preparing clear drawings showing access points, pull direction, splice locations, and slack‑loop placement for permitting and construction. Location: Manassas, Virginia Service: Fiber Pull Permit Documentation Infrastructure: Existing 1.5" conduit Cable Type: 864CT FOC Deliverables: Access notes, splice/slack‑loop details, conduit route drawings Scope of Work Documented access to existing handholes for fiber placement and splicing operations. Prepared permit‑ready drawings showing the use of existing 1.5" conduit for fiber installation. Added notes for placing fiber optic cable, performing splices, and adding slack loops at designated handholes. Marked pull direction, entry/exit points, and connection to existing AT&T handhole. Included clear annotations for construction crews and jurisdiction review.

Scope of Work

  • Documented access to existing handholes for fiber placement and splicing operations.
  • Prepared permit‑ready drawings showing the use of existing 1.5" conduit for fiber installation.
  • Added notes for placing fiber optic cable, performing splices, and adding slack loops at designated handholes.
  • Marked pull direction, entry/exit points, and connection to existing AT&T handhole.
  • Included clear annotations for construction crews and jurisdiction review.

What We Delivered

  • Fiber pull permit drawings with all access points
  • Splice and slack‑loop callouts at existing handholes
  • Documentation showing the existing conduit path
  • CAD sheets formatted for permit submission and field use